New Bathrooms!
When we moved into our condo in May of 2026, we weren’t thrilled with the bathrooms (to put it mildly). The construction team we chose to do the remodel said it would take 3-4 weeks.
Nearly four months – and a lot of plaster dust – later – our bathrooms are finally done!
Here are some fun before-and-after pix to show what we did.
Enjoy!
The Guest Bathroom had a scalloped sink, builder-grade cabinets, and dated tiles. And although it did have a walk-in shower – the glass on the shower doors was old-fashioned, and the tile floor was in bad shape.
And get a load of that bargain-basement bidet! It was just screwed on top of a regular toilet, and it was FILTHY.
We decided to replace the walk-in shower with a tub – but we didn’t expect them to install it sideways!!!
Kidding aside – it came out very nicely – and we were even able to hang all of our Travel Montage posters so our guests can enjoy pictures of our travels while they use the new facilities!
The Primary Bathroom had a huge jacuzzi tub in one corner – and no rigging for any kind of shower curtain, so showers would be pretty much impossible in there.
It had double sinks and a not-half-bad counter – but the same builder-grade cabinets, and an old-fashioned tile that was flowers and brown and pink and unspeakable.
We couldn’t be happier with the way the Primary came out – it is an absolute joy to use – and has so much storage space!
Oh, and also – we didn’t care for the backsplash in the kitchen when we moved in (it was too BUSY and BROWN) so we decided to also replace that with some beautiful Italian tile. Guess what color?
You’ll notice we also added a peninsula to the kitchen – it contains the trashcan on one side, and has a wine rack on the other!
(We also added that gorgeous tile to the arched opening in our front hallway!)